@ Indian Railway’s first Waste to Energy Plant uses “PolyCrack” Technology.
@ In Polycrack Technology, waste is processed and reformed in 24 hours. The only drawback is that it requires larger area.
@ The technology involves de-polymerization, cracking, reforming, scrubbing, particle filtration and rapid quenching.
@ The major benefit of the method is that it does not require pre-segregation.
0 comments:
Post a Comment